OUR CLIENTS

S/N

CLIENT

PROJECT

1

Morning Star International Hospital Port Harcourt Nigeria

Construction of a two storey purpose-built Hospital Building

2

FSB International Bank

Construction of Counting Room and Parking lot in Trans-Amadi Branch Office

   

Construction of Onne Branch building

Construction of Vault Room at Intels Camp Branch Office

3

Self

Construction of Twin Duplex Residential Building

4

Total (E&P) Nig. Ltd.

Consultancy services on:

   

6-Classroom blocks at Ibiomin, Usendon, Ukanafun, Minya, Mbiatok and Adadia Communities

Engineering Workshop building at Akwa Ibom Polytechnic, Ikot Osurua

5

Edo State Government

Classroom blocks at Ebhoakuala, Primary School, Ekpoma

6

CAMCO, NOWCAM, HUCHALOG, REDA Oil Servicing Companies

Maintenance of Offices and Expatriate Residential Properties (Civil, Plumbing and Electrical)

   

University of Uyo Lecture Theatre for Engineering Faculty

Open Shed Market Stores Buildings

Renovating of Health Centres and Classroom blocks

Design and supervision of 2.3 km Akai Oniong Road with Drain and Culverts

Design and Supervision of the Construction of a Model Secondary School at Amadaka

Design and Supervision of Institute of Management Studies for Akwa Ibom University of Technology (AKUTECH)

7

SPDC

Procurement, installation and commisioning of 2 Nos. 500 KVA transformers in Warri

8

Eye World Hospital

Extensive Finishing; Tilling Works for offices and residence (over 2000m2)

9

RSGV

Water Scheme in Choba

10

Total (E&P) Nig. Ltd.

Contract for fence extension and gate house at Institute of Petroleum Studies, Uniport, Port harcourt, Ref: NG 2848/SDE/03

11

Nigerian Ports Authority, Port Harcourt Nigeria

Treatment of boiler and chemical supply

12

Nigerian Ports Authority, Port Harcourt Nigeria

Procurement, installation and maintenance of split unit air conditioners

13

Nigerian Navy Secondary School, Borokiri, Port Harcourt Nigeria

Reconstruction of Burnt Otiko house female hostel

14

SPDC

Water Drilling Project with distribution at Bayelsa

15

Akwa Ibom state Government (C/o Etteh Aron & Partners)

Construction of deep (2m) discharge drain of Edo Eket-Ibeno Road

16

Impacto Nigeria

Construction of show room

17

Total (E&P) Nig. Ltd.

Foreign procurement of Masoneilan regulators, valves and petitioners for Actuator

18

Central Bank Senior Residential Quarters, Port Harcourt Nigeria

Construction of swimming pool, Borehole water treatment plant

19

Total (E&P) Nig. Ltd.

Surfacing of car park at plot 26, Trans-Amadi for the new base security upgrade project.

20

Total (E&P) Nig. Ltd.

Procurement, fabrication, installation and commisioning of streetlights, poles, 250 watts indirect light fittings and control circuit breakers in EPNL base

21

Total (E&P) Nig. Ltd.

Engineering design, procurement, installation and commissioning of electrical power system & illumination project fabrication of 1000 Amps capacity Automatic (Changeover) transfer switch-panel

22

Total (E&P) Nig. Ltd.

Construction of visiting lecturer quarters in institute of petroleum studies (IPS)

23

Total (E&P) Nig. Ltd.

Maintenance of split units air conditioners in EPNL Residential Areas in Port Harcourt Phase 2.

24

Total (E&P) Nig. Ltd.

Maintenance (overhauling), servicing and repairs of generators

25

Total (E&P) Nig. Ltd.

Installation of 15 Amps socket for air-conditioners-telecommunication/contract building

26

Niger Delta Development Commission

Design of Obozogbe-Niro-Abudu Road, Edo State Nigeria

27

Total (E&P) Nig. Ltd.

Maintenance of 878 split/package unit air conditioners in Total E&P office complex at Trans-Amadi industrial layout, Port Harcourt Nigeria

28

Delta State Government

Design consultancy on the Natural water ways channelization for Warri metropolis

29

Delta State Government

Design consultancy for the 100 kmsq storm water drainage for Delta State capital – Asaba

30

Chevron

Installation of Gas turbine, transformers and termination of High voltage and fibre optic cables

31

United Bank for Africa (UBA)

Design of reinforced concrete structures and consultancy services

32

St John's Catholic church, Rumukurushi

Steel Roof Design and detailing of 3-storey building complexes

33

Total (E&P) Nig. Ltd.

Renovation of dinning & laundry block of institute of petroleum studies

34

Total (E&P) Nig. Ltd.

Surfacing of car park at Total new base, Trans Amadi

35

Total (E&P) Nig. Ltd.

Revamping of main building of Totals Deputy Managing Director's Residence.

36

Government of Rivers State Nigeria

Design and Construction of 14 classroom blocks at state school, Rumukurushi

37

Port Harcourt Refinery PHRC

Re-design and Renovation of five blocks of forty single rooms in PHRC life camping office.

38

PHRC

Re-design and Renovation of PHRC life camping office: North and South wings

39

Niger Delta Development Commission

Supervision of the construction of Rumuekpe-Ogbele-Abua Road, Emuoha and Abua Local Government Area, Rivers State Nigeria.

 

 

 

 

 

 

Go to top